What should be paid attention to during running-in of ball mill?

How to operate the ball mill during the running in period is very important, because the operation of the running in period can prolong the service life of the ball mill and increase the output of the energy-saving ball mill. The running in period of the ball mill should be run in three days before it is put into use, so that the service time of vulnerable parts of the energy-saving ball mill can be longer. What problems should be paid attention to during the running in period of the ball mill, Fodamon engineer summarized as follows.

a. Pay attention to regularly check the level of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water), and pay attention to the tightness of the whole machine. At the same time, the lubrication of each lubricating point should be strengthened. It is recommended that the lubricating points should be filled with grease every half a year during the running in period (except for special requests).

b. At the end of the running in period, the machine shall be subject to forced maintenance, inspection and adjustment, and attention shall be paid to the exchange of oil.

c. Since the wet ball mill is a special device, the operator should receive the training of the manufacturer and fully understand the structure and performance of the machine. Before operating the machine, be sure to browse the operation and protection manual, and operate and maintain according to the requirements of the manual.

d. Keep the machine clean and adjust and fasten the loose parts in time to prevent the wear of parts or loss of parts due to looseness.

e. Pay attention to the working load during the running in period. Generally, the working load during the running in period shall not exceed 80% of the rated working load, and appropriate workload shall be deployed to prevent overheating caused by long-term continuous operation of the machine.

f. Pay attention to check all instruments frequently. If there is any abnormality, stop the machine in time to eliminate it. The operation shall be ended before the cause is not found and the fault is not eliminated.

When the ball mill enters the running in period, we must pay attention to the above contents. Only in this way can the ball mill carry out normal production in the future, and this can also reduce the damage of vulnerable parts of the ball mill. Therefore, we should make preparations for the running in period for the benefit of the enterprise.