1. How to build the aggregate factory, stones factory, quarry, gravel plant, sand plant and mine factory?
The first step is to investigate the market, to see whether the market prospects in this business, how is the profit and sale? Don’t blindly fight.
The second step is to select mines or river, handle the relevant mining procedures, this is a must, otherwise even the hastily produced, will be a lot of trouble.
The third step is to investigate the device, select a relatively strong strength of all aspects of the manufacturers, to order a set of excellent quality aggregate production line equipment.
The fourth step, after buying the mining crushing and screening equipment, these devices are not enough, the crushing and screening equipments are just one part of it, we also need to solve the engineering machinery, such as loaders, excavators, transport vehicles and other problems, as well as the mining machinery of blasting problems.
The fifth step, installation and commissioning test run after all the equipments in place, recruit workers, draw up the mining system and management; contact the customer at last production and sales. In fact, a considerable portion of the actual operation is the have clients first and then to invest and produce, the sales is the first.
2. In stone production line, sand making production line and beneficiation flow which mechanical equipments are required?
In crushing and screening, aggregate production line include coarse crushing of jaw crusher, fine crushing of jaw crusher machine, impact crusher, cone crusher, hammer crusher, double roll crusher, sand making machine, vibrating feeder, circular vibrating screen, sand washing machine, spiral ore washing machine, belt conveyor and so on. According to installation, it can be divided into fixed, semi-mobile and mobile three; the processing capacity of it is 10-500 t/h, product size and size distribution according to user needs.