Jaw crusher Installation,operation,maintenance attention

1、Because the vibratory quantity is big when the crushing machine is working,so we advice you install this Jaw crusher bases on concrete foundation. In order to reduce the vibrating voice,avoid to affect the base of building,after the stone crusher installed then put a piece of hardwood plate or rubber tape or other buffer material.
2、Before adjusting range of the discharge opening should loosen stretched spring. After adjusting then adjusting the tension embolism of the spring properly.
3、The user should according to the conditions of working site install protection equipment on the driving wheel,driven wheel and triangular belt,then can start to operate.